PROJECTS

 

 

  1. PRE-BID TRAFFIC AND TECHNICAL CONSULTANCY SERVISES FOR “ FOUR LANING OF AMRAWATI CHIKLI SECTION OF NH-6 KM-166.000 TO KM-360.000 IN THE STATE OF MAHARASHTRA UNDER NHDP PAHSE 4 ON DBFOT TOLL BASIS (PAC.1)”

 

          

  • CARRYING OUT BBD SURVEY,

  • CARRYING OUT SOIL INVESTIGATION  SURVEY(PIT) & TESTING

  • AXLE LOAD SURVEY 24HRS

2. 4-LANING OF PHAGWARARUPNAGAR SECTION OF NH-344A FROM KM-0.00 (DESIGN CHAINAGE) TO KM- 80.820 (DISIGN CHAINAGE ) IN THE STATE OF PUNJAB OF HYBRID ANNUITY MODE- WORK ORDER FOR CONDUCTING ENGINEERING SURVEYS.

  •  BBD SURVEY,

  • TRIAL PITS

  • BORROW AREA SOIL TESTING

  • TRAFFIC SURVEY

  • AXLE LOAD SURVEY 24HRS

3. 6-Laning of Varanasi – Handia section of NH-2 in the state of Uttar Pradesh (Carrying out engineering services & soil investigation)

 

 

  • Carrying out BBD Survey

  • Trial Pits (Testing of Subgrade Soil)

  • Borrow Area identification & Collection

  • Material investigation ( Aggregates , sand , fly ash , etc.)

 

 

4. Pre-bid Consultancy services for 6-Laning of Shamlaji – Himmatnagar section of NH-8 in the state of Gujrat.

 

 

  • Trial Pits

  • Borrrow area

  • BBD Survey

  • Traffic Survey

5. Preparation Of feasibility report of 2-Lane With Paved shoulder on EPC mode .of Tanakpur to Pithoragarh section of NH-349 In the state of uttarakhand .

 

 

  • BBD Survey

  • Trial Pits

  • Road Inventory

  • Structure Inventory

  • Pavement Condition

  • Roughness Survey

 

 

6.  Consultancy Services for preparation of Feasibility Study and  Detailed Project Report for 2 Laning  of Peren – Kohima state road in Nagaland under SARDP Phase-B on EPC Mode.

 

 

Traffic Survey:-

 

  • Classified Traffic Volume Count Survey (5 location),

  • Origin Destination Survey (2 Location),

  • Axle Load Survey (2 Location)

  • Road Inventory Survey (95 KM).

 

Engineering Survey:-

 

  • Subgraide soil sampling and its testing (95 Sample),

  • Material investigation and its testing (Aggregate and Sand 20 Sample),

  • BBD Survey (10 KM)

  • Borrow Area Collecting and it’s Testing (25 Sample).

 

 

7.  ‘SOIL INVESTIGATION FOR HARIDWAR-NAGINA  SECTION ON NH-75 IN THE STATE OF UTTAR PRADESH.

 

  • Soil testing (90 locations)

  • Dcp test (45 locations)

  • Fdd Test (90 locations

 

8. Rehabilitation and up-gradation of NH-66 (erstwhile NH-17) from km 241/300 to km 281/300 (Arawali – Kante Section) to four lane with paved shoulder in the state of maharastra under NHDP-IV.

 

 

  • 7-Days Classified traffic volume count survey

  • 3-Days Classified traffic volume count survey

  • Turning Movement count at intersection

  • 24 Hours Origin destination Survey

  • Axle Load Survey

  • Subgrade Testing

  • Natural Soil testing

  • Borrow area soil testing

  • Aggregates (Coarse & Fine Aggregates)

 

9. Consultancy  Services for Project Management Phase-l including preparation of Detailed Project Report for up gradation of Rameshwar-Gangolihat Berinag-Chaukori-Kanda-Bagheshwar-Takula-Almora section of NH 309-A in the State of Uttarakhand.

 

  • Classified Traffic Volume Count Survey (3 location),

  • Origin Destination Survey (3 Location),

  • Axle Load Survey (2 Location)

  • BBD Survey (62 Km)

 

10. The project in orissa at Singhara (Km 311.000) to Bijhabahal (Km 414.000). The road stretch passes through major township Keonjhar. (Design Chainage from Km.310.806 to Km.414.982) of NH-6 (New NH-49). Total length of the project alignment is around 104 Km (approx.).

 

 

  • Soil Investigation Survey – 17 Samples.

  • Carrying out preliminary pavement investigations by FWD test as per codal requirement (IRC: 115:2014) in proposed overlay section of the existing carriageway.

 

11. UP- gradation to 2/4 Lanes road with paved shoulder configuration for Helwak- Patan – Kharad KM 85+000 to KM 133+417 in the state of Maharashtra.

 

 

  • Test Pit Surveys (Subgraide Soil sample collection and its testing) – 50 Samples

  • OGL Samples Collection and its Testing – 27 Samples.

 

 

12.  Traffic Volume Count Surveys for Nagar – Alwar Stretch in the State of Rajasthan.

 

 

  • 3 Days Volume Count Surveys  - 2 Loation.

  • Turning Movement survey On intersections

  • Pedestrian/Animal Crossing

  • Videography Count

 

13. “Up-gradation to 6 lane with paved shoulders of Ahmedabad – Bagodara – Limbdi – Sayala section of NH 8A (New NH 47) from km 16+000 to km 138+000 on EPC mode in the State of Gujarat.

 

  • Subgraide Soil Sample Collection & its Testing.   – 6 Nos.

  • Natural Soil Collection & its Testing  -                     6 Nos.

  • Borrow Area Collection & its Testing -                     6 Nos.

  • 7 Days Traffic Volume Count Surveys -                   1 Location

  • Axle Load Surveys                              -                     1 Location with Double Pad,

  • BBD Surveys-                                                            108 KMs

  • Soil Collection for  BBD Correction -                         108 Nos.

 

 

14. Traffic Surveys & Engineering Surveys for Consultancy services for Feasibility Study and Preparation of Detailed Project for Improvement and UP-Gradation of in Principle declared National Highways in The state of Uttar Pradesh.

          

 

  • BBD Surveys                                              - 160 kms.

  • Roughness Surveys.                                    - 160 kms.

  • 7 Days Traffic Volume Count Surveys.      - 6 Locations.

  • Origin Destination Surveys.                        - 6 Locations.

  • Axle Load Surveys                                      - 6 Locations.

  • Turning Movement Count Surveys.            – 9 Locations.

  • Speed `n Delay Surveys.                             - 160 kms.

  • Traffic Analysis Report.

 

15. Preparation of Feasibility report for 2 Laning with paved shoulder of Lakahanpur to Bhasoli & Chakdyala to Udhampur Section of NH-44 in the state of Jammu & Kashmir.

 

 

  • BBD Survey

  • Traffic Survey (cvc , tmc, od survey )

 

 

16. Consultancy services for Preparation of DPR for development of Coastal Road from Nagapattainam to Tuticorin via Ramananthpuram - Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna - LOT-3 / Tamil Nadu & Puducherry /Package-1.

 

 

  • Borrow area                                                              -30 nos.

  • OGL Soil sampling                                                    -30 nos.

  • Test Pits For Subgrade Sample                               -66 nos.

  • Test Pits for Pavement Composition                        -66 nos.

  • Aggregate Sample Collection and Testing               -30 nos.

  • Sand Sample Collection and testing                        -10 nos.

  • Water Sample Collecting & Testing                         -06 nos.

  • Fly Ash/Bottom Ash samples collection and testing -03 nos.

  • Pavement Roughness test                                       -660 km.

  • FWD Test as Per irc-115:2014                                 -330 km.

 

17.  Pavement investigation for 4-lane section of Beawar-Pali-Pindwara section of NH-14 (from km 0+000 to km 244+120) in the state of Rajasthan.

 

 

  • Axle Load Survey (Dual Pad)    -   4 Location.

  • Traffic Volume Count (Manual) – 4 Location.

  • Traffic Volume Count (ATCC-Videography) – 2 Location.

 

18. Engineering Survices For Dwarka Expressway in the state of Haryana & Delhi.

 

  • BBD Testing                   -  22 KM.

  • Trial Pits (Soil Testing) – 10 Location.

  • Borrow Area Sampling  - 4 Location.

 

 

19. Traffic Surveys & Engineering Surveys for Garamore to Samakhaiyali Section from km 254+537 to km 306+000 of NH 8A(New NH27) - 51.46km state of Gujrat.

 

  • Traffic Volume Count                -  2 Location.

  • Axle Load Survey (Dual Pad)    – 2 Location.

  • Trial Pits                                   - 12 Location.

  • Core Cutting                              -12 Location.   

 

 

20.  Engineering Surveys for Solan – Kandaghat section of NH-5 in the state of Himachal Pradesh.

 

 

  • Trial Pits                         - 10 Locations.

  • Borrow Area                   - 10 Locations.

  • Traffic Volume Count    -    2 Location.

  • Axle Load Survey           -   2 Location.

 

 

21. Engineering Services For Nagpur – Bhandara Section of NH-6 in the state of Maharashtra.

 

 

  • BBD Testing                    -  30 KM.

  • Trial Pits (Soil Testing)  – 20 Location.

  • Borrow Area Sampling  - 10 Location.

  • Traffic Volume Count    - 2 Location.

  • Axle Load Survey            - 2 Location.

  •  

22. “Widening to 4-lane with paved shoulder with CC pavement from km 256/550 to km 289/500 on Kota - Darah Section of NH-12 (Kota- Jhalawar Road) in the State of Rajasthan.”

 

 

  • ATCC                                 - 1 Location.

  • Traffic Volume Count    - 2 Location.

 

23. Six  Laning  of  Shamla  ji  to  Motachilodha    from Existing Chainage -   km  401.200  to  km  494.410  (Length  93.210  km) section of NH-8 in the State of Gujarat under NHDP  Phase –V ( Package-VI) on Hybrid Annuity Mode

 

  • Test Pit                             - 10 Location.

  • Borrow Area                    -   6 Location.

  • Traffic Volume Count     -  2 Location.

  • Axle Load Survey             -  2 Location.

 

24. 4-Laning of Dwarka (Kuranga) – Khambhaliya – Devariya Section of SH-25 {NH (BHARATMALA)} (Between Existing Km 203.500 to 176.500 and Km 171.800 to 125.0000)

 

 

  • Test Pit                             - 10 Location.

  • Borrow Area                    -   6 Location.

  • Traffic Volume Count     -  1 Location.

 

25. Four Laning of Section from Km 26.0 (Palma Village of NH-23) To Km 89.170 (Gumla Bypass of NH-23)

 

  • Test Pit                             - 10 Location.

  • Borrow Area                    -   6 Location.

  • Traffic Volume Count     -  2 Location.

  • Axle Load Survey             -  2 Location.

 

26. 4-Laning of Poondiankuppam to Sattanathapuram (Design Ch. Km. 67.000 to Km123+800) section of NH-45A in the State of Tamil Nadu under NHDP Phase-IV on Hybrid Annuity Mode.

 

 

  • Test Pit                             - 10 Location.

  • Borrow Area                    -   5 Location.

  • ATCC                                 -   1 Location.

 

27. Traffic and engineering survey services for Jammu ring road project in the state of J&K.

 

 

  • ATCC (7days)                            -  2 Location.

  • Traffic Volume Count (3Days)   -  3 Location.

  • Traffic Volume Count (3Days)   -  5 Location.

  • Origin Destination Survey          -  5 Location.

  • Axle Load Survey (Dual Pad)    – 2 Location.

  • Trial Pits                                   -  57 Location.

  • Borrow Area                               -10 Location.   

 

28. ATCC Survey using videography on Beawar – Pali – Pindwara Section of Nh-162 in rajasthan .

 

 

  • ATCC (3days)                            -  4 Location.

 

 

 

 

 

29. 4-Laning of Kannauj – Bewar Section of NH-91A in the state of Uttar Pradesh.

 

 

  • Trial Pits                           -  8 Location.

  • Borrow Area                     -  8 Location.

  • Traffic Volume Count       -  1 Location.

 

30. Six laning of Kagal-Satara Section of NH-4 from Km 592+240 to 639+000 in the state of Maharastra.

 

 

  • Traffic Volume Count                                - 1 Location.

  • Axle Load Survey (with Dual Pads)          - 1 Location.

  • Trial Pits (Existing Subgrade Testing)    - 10 Locations.

  • Borrow Area Soil Collection & Testing – 10 Locations.

  • Material Testing (Aggregates)                 – 4 Locations.

 

 

31. Material Testing work for new alignment of Raipur – Durg Bypass & Bilaspur – Urga .

 

 

  • Subgrade Soil testing - 5 Locations.

  • Natural Soil Testing  - 10 Locations.

 

 

32. Traffic Survey for Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Upgradation of State Highway to National Highway by Adopting LIDAR or equivalent technology for the road “Naragund-Belavanaki-Gajendragad-Kushtagi-Tavargere-Sindhanur on NH-150A”, in the State of Karnataka on EPC mode”.

 

 

  • ATCC  (7 Days Videography)   -  3 Locations.

  • ATCC  (3 Days Videography)   -  2 Locations.

  • Turning Movement Count      - 10 Locations.

  • Origin Destination Survey       - 5 Locations.

  • Axle Load Survey                      - 3 Locations.

  • Pedestrian Counts                   -  3 Locations.

  • Speed & Delay Survey             - 160 km.

 

33. Traffic Survey & Engineering Survey for Stand Alone Jammu Ring Road in the state of J&K.”

 

 

  • ATCC  (7 DAYS )   -  2 Locations.

  • CTVC  (3 Days)     -  3 Locations.

  • CTVC  (1 Day)       -  3 Locations.

  • Origin – Destination  -  5 Locations .

  • Axle Load Survey   -  2 Locations.

  • Test Pits                    -  57 Pits.

34. Material Testing for Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Upgradation of State Highway to National Highway by Adopting LIDAR or equivalent technology for the road “Naragund-Belavanaki-Gajendragad-Kushtagi-Tavargere-Sindhanur on NH-150A”, in the State of Karnataka on EPC mode”.

 

 

  • Trial Pits for Subgrade Testing   -  32 Samples.

  • Trial Pits For Granular Material  -  32 Samples.

  • Borrow Area Samples                  -  16 Samples.

  • OGL Sampling / Testing               -  16 Samples.

  • Aggregate Testing                           -  8 Samples.

  • Sand Testing                                     -  4 Samples.

  • Fly Ash Sampling / Testing             - 2 Samples.

 

 

 

 

 

 

35. Development of Bishanpur – Jaleghatti section of SH-97 in the state of Bihar under Bhartmala Projects.

 

  • Test Pit                             - 10 Location.

 

36. Detailed Design of “Six lane configuration & Strengthening of new NH­248A existing km 2+740 (Rajiv Chowk) to km 11+682 in Gurgaon on Hybrid Annuity Mode in the State of Haryana”

 

 

  • ATCC (7 Days)                           - 2 Locations.

  • Origin – Destination Survey        - 2 Locations.

  • Axle Load Survey                       - 2 Locations.

  • Trial Pits  (Subgrade Testing)   - 10 Locations.

  • Borrow Area Samples                 - 3 Locations.

  • Topographical Survey                 - 9 Km.

 

37. Traffic Survey for Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Upgradation of State Highway to National Highway by Adopting LIDAR or equivalent technology for the road “Naragund-Belavanaki-Gajendragad-Kushtagi-Tavargere-Sindhanur on NH-150A”, in the State of Karnataka on EPC mode”.

 

 

  • ATCC  (7 Days Videography)   -  3 Locations.

  • ATCC  (3 Days Videography)   -  2 Locations.

  • Turning Movement Count      - 10 Locations.

  • Origin Destination Survey       - 5 Locations.

  • Axle Load Survey                      - 3 Locations.

  • Pedestrian Counts                   -  3 Locations.

  • Speed & Delay Survey             - 160 km.

 

38. Traffic Survey & Material Investigation for “Rehabilitation and Up-gradation to Four laning of NH-31D from km. 113.200 to km. 154.854 (Package-IIA) of Ghoshpukur – Salsalabari Section in the State of West Bengal on EPC mode’’

 

              

  • ATCC  (7 Days Videography)   -  2 Locations.

  • ATCC  (3 Days Videography)   -  2 Locations.

  • Turning Movement Count      -  5 Locations.

  • Origin Destination Survey       - 2 Locations.

  • Axle Load Survey                      - 2 Locations.

  • Pedestrian Counts                   -  5 Locations.

  • Trial Pits                                    - 20 Locations.

  • OGL Sample Collection           - 20 Locations.

  • Material  Collection                 - 10 Locations.

 

 

39. Traffic Survey for “Consultancy Services for preparation of DPR for Development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana - Lot 3/ Andhra Pradesh, Karnataka, GOA & Kerala /Package 1 (Dabaspete – Hoskote section of NH-207, Length approx.. -80km).”

 

 

  • ATCC  (7 Days Videography)   -  4 Locations.

  • ATCC  (3 Days Videography)   -  2 Locations.

  • Turning Movement Count      -  8 Locations.

  • Origin Destination Survey       - 4 Locations.

  • Axle Load Survey                      - 2  Locations.

  • Pedestrian Counts                   -  8  Locations.

  • Trial Pits                                    - 40 Locations.

  • OGL Sample Collection           - 40 Locations.

  • Material  Collection                 - 20 Locations.

 

40. Traffic Survey & Material Testing for for carry out the Feasibility Study and Preparation of Detailed Project Report for    Chittoor – Thachoor Road section (Green Field) for a total average length of 126 Km.

 

 

  • ATCC  (7 Days Videography)   -  5 Locations.

  • ATCC  (3 Days Videography)   -  6 Locations.

  • Origin Destination Survey       - 5 Locations.

  • Axle Load Survey                      - 3  Locations.

  • OGL Sample Collection           - 43 Locations.

  • Material  Collection                 - 20 Locations.

 

41. Level  Survey for Bharatpur – Mahua Toll Road in the state of Rajasthan .

           

  • Level Survey @ 20 mtr    -   114 km .

 

42. Traffic Survey & Material Testing for  carry out the Feasibility Study and Preparation of Detailed Project Report for  Basoli – thana Kalan – Naduan Section under Bhaaratmala Projects .

 

 

  • ATCC  (7 Days Videography)                 -  6 Locations.

  • Origin Destination Survey (3Days)       - 2 Locations.

  • Axle Load Survey                                     - 6  Locations.

 

43. “Engineering Design Consultancy Service on Four Laning of Kallgam to Karuppur km. 38. 700 to km. 50 382 and Two Laning with paved shoulders from Karuppur to Meensurutti from km. 50.382 to km. 98.433 under NHDP phase - IV on Hybrid Annuity Mode in the state of Tamil Nadu.

 

 

  • Trial Pits                                    - 18 Locations.

  • OGL Sample Collection           - 20 Locations.

  • Material  Collection                 - 20 Locations.

 

44. Traffic Survey on Delhi – Meerut Expressway Near Akshardham Flyover in the state of Delhi .

             

  • ATCC  (7 Days Videography)                 -  1 Location.

 

45. Traffic Survey on “4Lane To 6Laning Project Hapur - Moradabad Section of NH-24 Under Bharatmal Projects in the state of uttar Pradesh.

 

  • ATCC  (7 Days Videography)                 -  2 Location.

  • Origin - Destination Survey                   -  2 Location.

  • Registration Plate Survey                      -  2 Location.

  • Axle Load Survey                                     -  2 Location.

 

46. Traffic Survey on “4Lane To 6Laning Project Agra - Etawah Section of NH-2 Under Bharatmal Projects in the state of uttar Pradesh.

 

  • ATCC  (7 Days Videography)                 -  2 Location.

  • Origin - Destination Survey                   -  2 Location.

  • Registration Plate Survey                      -  2 Location.

  • Axle Load Survey                                     -  2 Location.

 

 

47. Traffic Survey on “4Lane To 6Laning Project Kishangarh - Gulabpura Section of NH-79 Under Bharatmal Projects in the state of Rajasthan.

 

  • ATCC  (7 Days Videography)                 -  2 Location.

  • Origin - Destination Survey                   -  2 Location.

  • Registration Plate Survey                      -  2 Location.

  • Axle Load Survey                                     -  2 Location.

 

48. Traffic & Engineering Studies for 6Laning of Purnia - Ghospukur Section of NH-31 in the state of Bihar & West Bengal.

 

 

  • ATCC  (7 Days Videography)                 -  4 Location.

  • Origin - Destination Survey                   -  4 Location.

  • Axle Load Survey                                     -  4 Location.

  • Roughness Testing (Using Bump integrater)  - 550 km.

  • Falling Weight Deflection Test (FWD)     - 106 km.

 

 

49. Traffic & Engineering Studies for 6Laning of Salasabari - West Bengal Border Section of NH-31c in the state of  West Bengal.

 

 

  • ATCC  (7 Days Videography)                 -  1 Location.

  • Origin - Destination Survey                   -  1 Location.

  • Axle Load Survey                                     -  1 Location.

  • Roughness Testing (Using Bump integrater)  - 100 km.

  • FWD (Falling Weight Deflection Test)       -  25 km.

 

50. Traffic Studies for Saharanpur Smart City Project in Saharanpur City in the state of Uttar Pradesh.

 

  • Classified Traffic Volume                       -  10 Location.

  • Origin - Destination Survey                   -  5 Location.

  • Turning Movement Count                     -  5 Location.

  • Parking Survey                                        - 6 Locations.

  • Pedestrian Counts                                  -  10 Locations.

 

51.Engineering Design Consultancy Service for Green field Alignment for Delhi – Vadodara Expresssway for PKG – iv , vi , vii , viii in the state of Rajasthan .

 

  • Trial Pits on OGL Locations                   - 12 Locations.

  • Borrow Area Sample Collection           - 20 Locations.

  1. “Carrying out traffic surveys along three proposed RRTS Stations – Sahibabad , Ghaziabad and guldhar. in the state of Uttar Pradesh .

    

 

  • Videography Traffic volume count                            - 10 Locations.

  • Origin – Destination Survey (Application Based)     - 10 Locations.

 

52. “Carrying out traffic surveys for DPR for feasibility studies and survey of possible shortest financial economical alignment elevated road, extension from 6-Lane hindon elevated road at Ghaziabad to DND Flyover or / and any other possible link to Noida or any other important road.

           

 

  • Videography Traffic volume count                            - 3 Locations.

  • Origin – Destination Survey                                        - 3 Locations.

  • Turning movement count                                            - 2 Locations.

 

  1. Carrying out Traffic Studies for Tirupati-Tiruthani-Chennai (NH-205)

           

 

  • Videography Traffic volume count (AUTOMATIC COUNTS)                         - 3 Locations.

  • Origin – Destination Survey                                                                               - 3 Locations.

 

53. “Consultancy Services for Traffic Survey (ATCC) in Kolkata City.

             

  • ATCC @Mid Block - Videography Traffic volume count (AUTOMATIC COUNTS)                         - 2 Locations.

  • Origin – Destination Survey                                                                                                                   - 2 Locations.

  • ATCC @TMC-            Videography Traffic volume count (AUTOMATIC COUNTS)                         - 7 Locations.

  • Pedestrian Counts                                                                                                                                    - 4 Locations.

 

54. “Carrying out Traffic Survey (ATCC) for 2 Lane widening project for  Chomu – Jobner – Mahla section of sh-8a in the state of Rajasthan.

             

  • ATCC @Mid-Block - Videography Traffic volume count (AUTOMATIC COUNTS)                         - 2 Locations.

  • Origin – Destination Survey                                                                                                                   - 2 Locations.

 

 

55. “Carrying out Traffic Survey & Engineering Studies for 4/6 Laning of NH-24 (NH-9B)           

 

 

  • ATCC @Mid Block - Videography Traffic volume count (AUTOMATIC COUNTS)                         - 2 Locations.

  • Origin – Destination Survey                                                                                                                   - 2 Locations.

  • Axle Load Survey   (48 Hrs)                                                                                                                     - 2 Locations.

  • Trial Pits (Subgrade Testing)                                                                                                                   - 24 Locations.

 

56. “Traffic & Engineering Survey for Pre Bid Services for 6 laning from km 42.000 to km 80.00 of Dodaballapur Bypass to Hoskote section of NH-648 (Old NH-207) on Hybrid Annuity Mode under Bharatmala Pariyojna, in the state of Karnataka (Package-II)

 

 

  • ATCC @Mid Block - Videography Traffic volume count (AUTOMATIC COUNTS)                         - 2 Locations.

  • Origin – Destination Survey                                                                                                                   - 2 Locations.

  • Axle Load Survey   (24 Hrs)                                                                                                                     - 2 Locations.

  • Trial Pits )                                                                                                                                                  - 4 Locations.

  • Borrow area soil collection & Testing                                                                                                   - 3 Locations.

  • OGL Soil Collection & Testing                                                                                                                 - 4 Locations.

  • Material Collection & Testing (Aggregates, Sand , Fly Ash etc.)                                                     - 6 Locations.

  • Topography Survey                                                                                                                                  - 40 km.

 

57. Road Network Inventory for Faridabad Smart City Project (FSCL)

 

  • Road Network Inventory & Speed-Delay Survey                                                                                        - 412 km.

 

58. Traffic survey using ATCC on Pathankot (HP/Punjab Border) to mandi section of NH-20 (New NH-154) from km 11.000 to km 208.000 in the state of Himachal Pradesh.

 

 

  • ATCC @Mid Block - Videography Traffic volume count (AUTOMATIC COUNTS)                        - 5 Locations.

 

59. Axle Load Survey & Material Testing for NH-544 in the state of Kerala.

  • Axle Load Survey   (24 Hrs)                                                                                                                     - 2 Locations.

  • Trial Pits )                                                                                                                                                  - 14 Locations.

  • Core Cutting & Testing                                                                                                                           - 14 Locations.

 

60. Axle Load Survey & Material Testing for RIDCOR Project for Various Roads in the state of Rajasthan.

 

 

  • Axle Load Survey   (48 Hrs)                                                                                                                     - 8 Locations.

  • Trial Pits )                                                                                                                                                  - 46 Locations.

  • Core Cutting & Testing                                                                                                                           - 42 Locations.

 

 

61. Traffic Studies for Lucknow Smart City Project in the state of Uttar Pradesh.

 

 

  • Turning Movement Count @ Juntion locations                                                                                 - 40 Locations.

  • Pedestrian Count @ Juntion locations                                                                                                 - 40 Locations.

  • Road Inventory                                                                                                                                         - 300 Kms.

  • Topographycal Survey  @ Juntion locations                                                                                       - 40 Locations.

62. Axle Load Survey & Material Testing for Ludhiana- Karar , Patial – Sangrur & Sangrur Tapa sections in the state of Punjab .

 

  • Axle Load Survey   (48 Hrs)                                                                                                                     - 3 Locations.

  • Trial Pits )                                                                                                                                                  - 45 Locations.

  • Core Cutting & Testing                                                                                                                           - 60 Locations.

 

 

63. Traffic Survey for “KSTP – II –REBUILD KERALA INITIATIVE- CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR 250 KM OF ROADS IN CENTRAL DISTRICTS OF KERALA STATE-PACKAGE-III”

 

  • ATCC  (3 Days Videography)   -  10 Locations.

  • Intersection Counts                  -  44 Locations.

  • Origin Destination Survey       - 10 Locations.

  • Axle Load Survey                      - 9  Locations.

  • Speed & Delay Survey            - 225 Km.

  • Willingness to Pay                  - 10 Locations.

 

 

64. Soil & Material Testing “KSTP – II –REBUILD KERALA INITIATIVE- CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR 250 KM OF ROADS IN CENTRAL DISTRICTS OF KERALA STATE-PACKAGE-III”

               

 

  • Test Pits ( Subgrade Testing)   -  185 Locations.

  • DCPT Test                                    -  185 Locations.

  • Borrow Area Samples                   - 25 Locations.

  • Sand Samples                                  - 7  Locations.

  • Aggregate Samples                        - 8  Locations.

  • Water Samples                              - 10 Locations.

 

65. Soil & Material Testing For “Construction of 6 Lane access controlled Highway from DND Maharani Bagh To Junction with Jaitpur – Pussta Road section of NH-148NA Design Chainage ch-0.000 to 9.

 

   

  • Test Pits ( Subgrade Testing)   -  25 Locations.

  • DCPT Test                                    -  25 Locations.

  • Borrow Area Samples                   - 25 Locations.

  • Sand Samples                                  - 4  Locations.

  • Aggregate Samples                        -  4 Locations.

 

66. Soil & Material Testing For “Construction of 8 Lane access controlled Highway (PKG-6,7,8) & PKG-11.

 

 

  • Test Pits ( Subgrade Testing)   -  12 Locations.

  • OGL Samples                               -  12 Locations.

  • Borrow Area Samples                   - 15 Locations.

  • Sand Samples                                  - 4  Locations.

  • Aggregate Samples                        -  4 Locations.

 

67. Traffic Survey for Bhatinda – Amritsar Expressway Project in the state of Punjab.

 

 

  • ATCC ( 7 Days Videography Automatic Count)   -  10 Locations.

  • Origin – Destination Survey (24 Hrs)                   -   10 Locations.

 

 

68. Soil & Material Collection and Testing for Delhi – Amritsar – Katra Expressway in the state of Haryana & Punjab.

 

 

  • Borrow Area Soil Collection & Testing   -  10 Locations.

 

 

69. Consultancy services for river training , storm water disposal planning and road pavement rehabilitation at Mundra port in Gujrat.

 

 

  • Axle Load Survey with Double Axle Pad          -   2 Locations.

  • Trial Pits & Subgrade Testing                            -   10 Locations.

 

  1. Consultancy services for “Survey , Investigation , Traffic volume count, Axle load Survey, BBD Testing, of the existing layer of DBM & its Sub base layers for Ankheer to bhadkal Flyover.

 

 

  • ATCC (automatic traffic volume count             -  1 Location.

  • Axle Load Survey with Double Axle Pad          -   1 Locations.

  • Trial Pits & Subgrade Testing                            -   2 Locations.

  • BBD Survey                                                           -    2.6 km

 

70. Consultancy services for “Construction maintenance and operations of durg Bypass joining from km308+600 to 326+600 of NH-6 in the state of Madhya Pradesh now chattisgarh under Built operate and transfer (BOT) Toll Basis.

 

 

  • Road Roughness Testing                                    - 77KM.

  • Axle Load Survey with Double Axle Pad          -   1 Locations.

  • Trial Pits & Subgrade Testing                            -   4 Locations.

  • Core Cutting                                                          -    19 Samples.

 

 

71. Material Testing for “Construction of four/six lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-5 village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under Bharatmala Pariyojana in the State of Punjab on Hybrid Annuity Mode” (Package- 1, 2 &3)”

 

 

  • Borrow area soil collection & Testing              - 10 Locations.

  • OGL soil collection & Testing                           -   13 Locations.

 

  

72. Material Testing for “Construction of four/six lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-5 village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under Bharatmala Pariyojana in the State of Punjab on Hybrid Annuity Mode” (Package- 1, 2 &3)”

 

 

  • Borrow area soil collection & Testing              - 10 Locations.

  • OGL soil collection & Testing                           -   13 Locations.

 

 

73. Material Testing for  “Prebid of SPUR of Vadodara Mumbai expressway (Package 14, 15 and 16)

 

 

  • Borrow area soil collection & Testing              - 6 Locations.

  • OGL soil collection & Testing                           -   6 Locations.

 

74. Traffic survey for Design Consultancy Services for “Six Laning of Thalapady to Chengala section of NH-17 (New NH-66) from Ch. 17+200 (existing km 17+200) to Ch. 56+200 (existing Km 57+200) (Total length 39.00km) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna”.

 

       

 

  • ATCC  (7 Days Videography)   -  1 Locations.

  • Intersection Counts                  -  1 Locations.

  • Origin Destination Survey       - 1 Locations.

  • Axle Load Survey                      - 1  Locations.

 

 

75. Material Testing for Design Consultancy Services for “Six Laning of Thalapady to Chengala section of NH-17 (New NH-66) from Ch. 17+200 (existing km 17+200) to Ch. 56+200 (existing Km 57+200) (Total length 39.00km) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna”.

 

 

  • OGL Soil samples Test                 -  20 Locations.

  • Borrow Area Samples                   - 8 Locations.

  • Sand Samples                                  - 2  Locations.

  • Aggregate Samples                        - 2  Locations.

  • Water Samples                              - 2 Locations.

76. Traffic survey for providing Consultancy services for preparation of Traffic Report for Lebad- Manpur section in the state of Madhya Pradesh.

 

      

 

  • Traffic Volume Count (24hrs x 7Days) –Videography Including Traffic Survey Report ADT & Estimation of AADT OD Matrix Analysis & Desire Line Diagrams Secondary Data Collection for Seasonal Correction and Growth Rate Estimation Growth Rate Estimation Traffic Diversion Analysis Traffic Forecast – 3 Scenarios (Optimistic/Pessimistic/Base) up to Concession Period Toll Revenue Forecast – 3 Scenarios (Optimistic/Pessimistic/Base) up to Concession Period Identification of possible risk factor to which Revenue Forecast is sensitive Residual Life Estimation & Overlay Requirement Overlay/Rehab requirement .

  • 7 Days & 3 Days Video Count               -  2 Locations.

  • Origin Destination Survey                     - 2 Locations.

  • Axle Load Survey                                    - 2  Locations.

  • Falling Weight Deflection Test            -  40 KM

  • Trial pits for Subgrade Testing             -  16 Nos.

 

 

77. Traffic surveys for traffic modelling and connectivity proposals Work for development of Industrial Node at Kurnool.

      

 

  • ATCC  (1 Day Videography)   -  9 Locations.

  • Origin Destination Survey       - 9 Locations.

 

 

78. Traffic modelling and connectivity for development Work for KBNIR project at Rajasthan    

 

 

  • ATCC  (2 Day Videography)   -  6 Locations.

  • Origin Destination Survey       - 6 Locations.

  • Turning movement count        - 1 Location.

 

 

79. Traffic Surveys on road NO.-1069 Dharma dhaba to Indian oil corner , 1082- Vyapar mandal to ss school , 1083- ss school to esi chowk , 10104 gochi drain to sohna road  , 10105 hardware chowk to  gonchi drain in FMDA Faridabad.

 

  

  • ATCC  (3 Days Videography)   -  5 Locations.

  • Axle load Survey (24Hrs)          - 5 Locations.

80. Traffic surveys for Traffic and Technical Due Diligence by Mubadala Infrastructure Holding Company (Mubadala) Work for conducting traffic surveys on the roads in Uttar Pradesh /West Bengal / Jharkhand / Tamil Nadu/ Odisha / Andhra Pradesh. 

 

 

  • ATCC  (7 Days Videography)   -  11 Locations.

  • Origin Destination Survey       -  11 Locations.

 

81. Traffic surveys work for agra ring road agra in the state of uttar pradesh. 

 

 

  • ATCC  (7 Days Videography)   -  1 Locations.

  • ATCC  (3 Days Videography)   -  2 Locations.

  • Origin Destination Survey       -  3 Locations.

  • Turning Movement Count      -  6 Locations.

 

82. Traffic Surveys for Consultancy Services for preparation Detailed Project Report for the

proposed Coastal Road (Package - I & II)

 

 

 

  • 2Days Manual CVC Count                         -  6 Locations.

  • 3 Days Videography TMC                          -  6 Locations.

  • Origin Destination Survey                         -  4 Locations.

  • Axle load Survey with Double Axle pad  - 3 Locations.

 

 

 

Topographical Survey

PROJECTS UNDERTAKEN

 

SR. NO.

PROJECT UNDERTAKEN (RECENT 2018-19)

REMARKS

  1.  

GWALIOR TO JHANSI (80KM)

WORK DETAILS

  1. TOPOGRAPHICAL SURVEY INCLUDING PREPARATION OF DWG.

  2. TRAVERSING

  3. LEVELING

 

 

  1.  

RAIL VIKAS NIGAM LIMITED (67 KM)

NAGANSUR RAILWAY STATION TO GULBARGA JN.

(AT MAHARASHTRA & KARNATAKA.

WORK ASSIGNED

  1. GROUND CONTROL POINT

AT 5KM INTERVAL ON PERMANENT STRUCTURE

  1. TOPOGRAPHY OF STATIONS WITH GCP

  2. PREPARING CONTOUR DRAWING

  3. DRONE TOPOGRAPHY

 

 

 

  1.  

MPG ASSOCIATES

WORK DETAILS

  1. TOPOGRAPHICAL SURVEY INCLUDING PREPARATION OF DWG.

  2. CROSS-SECTION, L-SECTION @10M OF THE CONSTRUCTED ROADS

  3. PATUADI ROAD FROM MPR TO CONTROL AREA

  4. FARUKHNAGAR ROAD FROM NPR TO CONTROL AREA

 

 

 

  1.  

PWD

WORK DETAILS.

TAMEN TO DOLLUNGMUKH (ARUNACHAL PRADESH)

108 KM STRETCH NEW ALIGNMENT.

  1. SERVICE ON TOPOGRAPHICAL SURVEY

  2. GROUND CONTROL POINT AT 5KM INTERVAL

WITH DGPS.

  1. L-SECTION CROSS- SECTION AT 20M INTERVAL

  2. TRAVERSING

 

 

 

 

 

 

  1.  

Conducting Levelling Survey from Km 135.469 (Kotakatta) to Km 211 (Kurnool) on NH-44 (Old nh-7) in the State of Andhra Pradesh & Telangana

 

  1. Levelling Survey With using Auto Level to Calculate Road Camber.

 

Total – 148 km

  1.  

Railway doubling (RVNL) project DGPS control points for UAV survey (Drone Survey) From akkalkot to Gulbarga at Maharashtra and Karnataka.

Total – 67 km

  1.  

New road Alignment topography survey detailing , traversing, tbm pillars , dgps pillars , levelling , dgps , pair from tamen (arunachal Pradesh) to dollungmukh (assam)

Total – 105 km

  1.  

Topography Survey @ Junction Locations in Lucknow

 

Client :- KMM Consultant Pvt. Ltd ( Parent Client – Lucknow Nagar Nigam)

Total  - 17 Junctions

  1.  

Topography Survey @ Junction Locations in Ghaziabad

 

Client :- KMM Consultant Pvt. Ltd ( Parent Client – Ghaziabad Development Authority)

Total  - 7 Junctions